Friday, March 30, 2018

Optical Fiber ODF Splicing Work,Fiber Solutions BD.

Optical Fiber Cable Laying Work by Under Ground with 40/33 HDPE Duct Pipe Used in BBG Project in Bangladesh. Stranded Cable Laying by Fiber Solutions BD  and  Splicing Work. Below picture at Outside Cable laying work Wall mount patch pannel Setup.


          Fiber Solutions BD

2 comments:

  1. Nice Blog. Thanks for sharing some amazing information on optic fiber cable . I really loved your blog and looking forward to it.

    ReplyDelete